Contaminated site

Contaminated site case study. Campbellfield, Victoria

Duraseal installed a gas mitigation system in Campbellfield, Victoria where an 8,000sqm warehouse was built on a reclaimed rubbish dump.

The floor had sunk in a dozen areas making day to day business next to impossible as forklifts could not be driven over it for fear of them tipping.  A large number of pile caps were installed to fix the slumping issue before our works began.

We installed the collection and discharge points and linked them using a collection cell.  The mitigation system was then installed we and sprayed the seams to ensure a 100 per cent seal.  All areas were then tested before a protection layer was installed and handover was completed as this was a large site.